Service level and the z value that sets safety stock
"95% service level" can mean two things: 95% of order cycles without a stockout, or 95% of demand filled. Which one you mean changes the inventory you need.
Two definitions
The cycle service level is the probability of no stockout within an order cycle: at 95%, one cycle in twenty may run short.
The fill rate is the share of demand actually supplied: at 95%, 5% of the quantity requested is missing. For high-volume items with small shortfalls, the fill rate stays high while the cycle level falls, so the two can diverge widely.
The z in the safety-stock formula is normally the cycle service level. Miss that and "95% is safe" turns into more stockouts than expected.
Where z comes from
Assuming normally distributed demand, each service level maps to a z: 1.28 for 90%, 1.65 for 95%, 1.96 for 97.5%, 2.33 for 99%, 3.09 for 99.9%.
95% is 1.65 rather than 1.96 because a stockout happens in one tail only. Covering 95% on both sides gives 1.96; covering the lower 95% gives 1.65.
The z slider runs from 0 to 3.5 and recomputes the buffer and reorder point immediately.
It gets expensive fast
Raising the target raises the buffer faster than linearly. Going 90% to 95% is cheap; going 99% to 99.9% is not.
With σ = 35 and lead time 9, 90% needs 134 units and 99.9% needs 325 — 2.4 times the stock for 9.9 points.
A service level is therefore not "higher is better"; it is a match between carrying cost and the cost of a stockout. If a stockout costs less than the margin lost, 99% is overkill.
ss = z * sigma * sqrt(L)
# z: 1.28 (90%) · 1.65 (95%) · 1.96 (97.5%) · 2.33 (99%) · 3.09 (99.9%)
# sigma 35, L 9 → 105 * z
When the normal assumption fails
If demand is not normal, the z table misleads. Seasonal peaks and slow-moving items are the usual cases.
Use observed data instead: collect demand over past lead times and take the percentile you want. That value is the buffer for your target service level.
The normal assumption keeps the arithmetic simple, but data beats it when you have data. Moving z in the simulator shows how much the assumption matters.
| Service level | z | Safety stock (σ35, L9) | vs reorder point |
|---|---|---|---|
| 90% | 1.28 | 134.4 | +12.4% |
| 95% | 1.65 | 173.3 | +16.0% |
| 97.5% | 1.96 | 205.8 | +19.0% |
| 99% | 2.33 | 244.7 | +22.7% |
| 99.9% | 3.09 | 324.5 | +30.0% |
How to decide
Estimate the loss per stockout — lost sales, expediting, damaged trust — and the annual cost of carrying one unit.
Together with the demand distribution those give the service level that minimises expected cost, and moving z by hand in the simulator confirms the shape.
Then revisit it. When demand or lead time changes, so does the right service level, so recompute each quarter.
Questions
Does 95% mean a 5% stockout rate?
On the cycle service level, 5% of order cycles run short. The fill rate is a different measure, so state which one you mean.
Can I compute z myself?
Take the inverse of the normal distribution: in a spreadsheet NORM.S.INV(0.95) = 1.645.
Sources
Every calculation here can be reproduced with a template in the simulator.
Open the simulator